Renovation Service
Cabinet replacements, countertop upgrades, and full gut renovations across Metro Detroit and Southeast Michigan.
Home & Hardscape remodels kitchens for homeowners throughout Metro Detroit and Southeast Michigan. From cabinet replacement and countertop upgrades to full gut-and-rebuild projects, we manage the work from demo to final trim.
Scope
A kitchen remodel can mean anything from swapping out cabinet doors to taking the room down to the studs and starting over. Most projects fall somewhere in between.
New cabinet doors, hardware, countertops, and backsplash without moving anything structural. The fastest and most affordable way to update a dated kitchen. Most cosmetic refreshes take 1–2 weeks.
New cabinets, countertops, flooring, backsplash, and updated lighting — same layout, everything replaced. The most common kitchen remodel scope for Metro Detroit homeowners. Takes 3–5 weeks.
Demo to the studs. New layout, new electrical, new plumbing, new everything. Best for kitchens with poor layouts, aging infrastructure, or significant damage. Takes 6–12 weeks depending on scope.
What We Install
We install semi-custom and custom cabinetry from trusted suppliers. Cabinet choice has the biggest impact on both the look and the budget of a kitchen remodel. We help you choose based on your style, storage needs, and budget — not just what looks good in a showroom.
Quartz is the most popular countertop choice for Metro Detroit kitchens — durable, low maintenance, and available in a wide range of styles. We also install granite, marble, butcher block, and laminate depending on budget and preference.
Tile, stone, or slab backsplash installed to complement your countertops and cabinets. We handle the tile work in-house — no separate tile contractor needed.
Hardwood, LVP (luxury vinyl plank), tile, or refinished existing hardwood. We coordinate or install kitchen flooring as part of the remodel so everything gets done at the right time in the right sequence.
Recessed lighting, under-cabinet lighting, and pendant fixtures over islands. Lighting is one of the highest-impact, lowest-cost upgrades in a kitchen remodel. We work with a licensed electrician for all electrical work.
New sink, faucet, and garbage disposal as part of the remodel. If your project involves moving the sink or adding a kitchen island with plumbing, we coordinate with a licensed plumber.
We don't sell appliances, but we coordinate installation timing so your new appliances arrive and get set in place at the right point in the project. If you need appliance recommendations, we're happy to share what's worked well in past projects.
Pricing
Kitchen remodel costs in Metro Detroit vary significantly based on scope and finishes:
Cosmetic refresh: $8,000–$20,000
Mid-range remodel (same layout): $25,000–$55,000
Full gut remodel: $55,000–$120,000+
The biggest cost drivers are cabinet quality and whether the layout changes. Moving plumbing, electrical, or load-bearing walls adds significant cost. Keeping the same footprint and upgrading finishes is the most cost-effective path to a dramatically different kitchen.
We provide detailed, itemized estimates before any work begins. No surprises.
How We Build
We walk your kitchen, discuss what you want to change, and establish a realistic budget range before anything else.
Cabinet layout, countertop material, tile, flooring, and fixtures are selected. We provide a detailed scope of work and contract before demo begins.
Most kitchen remodels involving electrical or plumbing work require permits. We pull all required permits.
Existing cabinets, countertops, flooring, and anything being replaced is removed and disposed of.
Electrical, plumbing, and any structural changes happen while walls are open.
Rough-in work is inspected and approved before walls are closed.
Walls are closed, finished, and painted.
Cabinets are set, leveled, and secured.
Countertops are templated after cabinet installation and installed 1–2 weeks later.
Backsplash tile, flooring, lighting, and plumbing fixtures are installed.
Trim, hardware, and final details are completed. We walk the finished kitchen with you before we consider the job done.
FAQ
We respond within 24 hours. No pressure, no obligation.